#####
Take a virtual trip on the Granite State Rail Trail. By clicking on these links from top to bottom, you will be following the GSRT from North to South. When you get to the end, in Salem, keep on going into Methuen, Mass.
New Hampshire Sections
Allenstown (No group yet)
Hooksett (No group yet)
Massachusetts Connections
Merrimack River Greenway Trail
Feasibility Study (pdf)
Please note: This study was completed in 2011 and lots has changed in the last 6 years. The most significant changes are:
-
The Pan Am Railway right-of-way between Boscawen and Horseshoe Pond was not anticipated at the time.
-
The possibility of building the downtown trail, between Horseshoe Pond and the cornfields, in conjunction with the Extension of Storrs Street, was not anticipated at the time.
-
Cost estimates are no longer considered to be valid.
We are working on an update to the feasibility study.
(Click on button below for the 2011 Feasibility Study.)
.