Plans & Studies
-
Merrimack River Greenway Trail Feasibility Study, Dec. 2011 (pdf)
-
Please note: This study was completed in 2011 and lots has changed in the last 14 years. The most significant changes are:
-
The availability of the abandoned railroad right-of-way between Boscawen and Horseshoe Pond was not anticipated at the time.
-
The possibility of building the downtown trail, between Horseshoe Pond and the cornfields, in conjunction with the Extension of Storrs Street, was not anticipated at the time.
-
Cost estimates are no longer considered to be valid.
-
Appendix A: Merrimack River Greenway Path Corridor Plan
-
Appendix B: Photos and Location Plans
-
Appendix C: Issues Graphics
-
Appendix D: Property Ownership Plans
-
Appendix E: Flood Data Plans
-
Appendix F: “Terrill Park Area” Environmental Documentation
-
Appendix G: Conceptual Level Cost
-
Appendix H: GPS Reference Waypoint Coordinates (WGS84)
-
Appendix I: General Project Elements
-
-
-
Connected Trail Links